Can you make a strong connection underwater?
This 33kV hybrid wet-mate connector for offshore wind farms was needed to eradicate the need to raise cables to the surface from the seabed to connect and reconnect them.
This 33kV hybrid wet-mate connector for offshore wind farms was needed to eradicate the need to raise cables to the surface from the seabed to connect and reconnect them.
How easy is it to move materials? As part of a major capital investment project, a factory was looking to move pallets from the existing to the new production line.
Do operating conditions impact on design? For manufacturers who implement LEAN practises. Losses such as waste and downtime are ....
Is your design electrifying? Rapid CAD design completed for an electronics case fulfilling the client’s brief in full and before time!
Are all pumps simple? There are such a huge range of pumps available for a wide range of functions. This unit had a very specific need.
I’ve got a platform, but is it safe?
How important is the base of a Crane?
What is the right hook?
Let's talk
Call our team +44 (0)150 936 3060
Email info@beneng.co.uk