Can you make a strong connection underwater?
This 33kV hybrid wet-mate connector for offshore wind farms was needed to eradicate the need to raise cables to the surface from the seabed to connect and reconnect them.
This 33kV hybrid wet-mate connector for offshore wind farms was needed to eradicate the need to raise cables to the surface from the seabed to connect and reconnect them.
Did any of us who work in the manufacturing arena ever expect plant teams to be working from home?
Let's talk
Call our team +44 (0)150 936 3060
Email info@beneng.co.uk