Case study · Construction products

Granulate system

A lean-phase pneumatic conveying system to recover granulate for a leading roof tile manufacturer.

Client
A leading roof tile manufacturer (under NDA)
Sector
Construction products: roof tiles
Services
Site survey, project brief and plant design
Scope
Replacement for a screw conveyor and bucket elevator

The granulate pellets for the roof tiles were originally applied by hand, and the ageing system that replaced it was unreliable. It was difficult to maintain and material wasn’t landing properly, so waste was high.

The client needed a replacement for an unreliable, hard-to-maintain screw conveyor and bucket elevator, and the spillages and hazards in the existing set-up had to go.

We spent time on site to put together a thorough project brief, measure up the plant location properly and make sure the right processes would be used.

The solution we identified was a simple lean-phase pneumatic conveying system to recover the granulate, designed to remove the spillages and hazards of the old set-up.

Project outcomes

What the new plant delivers

  • Rapid clean down to minimise changeovers and reduce cross contamination
  • Reduced leakages and spillages
  • Safe and easy access for maintenance
  • Installed with minimal downtime

How we did it

Time on site before any design work

Getting the brief right on site meant the new plant was designed around the real space and process, with one team from survey to final design.

  1. 01Survey and briefOn-site survey, measurements and a full project brief
  2. 02ConceptA lean-phase pneumatic conveying solution
  3. 03DesignDetailed design of the replacement plant
25+Years solving plant and machinery problems
1,000+Projects designed and delivered
95%Of our designs go on to be manufactured

Plant that’s hard to keep running?

If ageing conveying or handling equipment is costing you time and material, tell us about it. We’ll come and look, then give you an honest view of the best fix.