Case study · Offshore wind
WetMate
Design and validation of a 33kV hybrid wet-mate connector, so offshore wind cables can be connected without raising them to the surface.

- Client
- Under NDA
- Sector
- Offshore wind
- Services
- Concept review, detailed design, validation and prototype drawings
- Scope
- 33kV hybrid wet-mate connector
The challenge
Connecting cables on the seabed
As offshore wind farms go deeper, inspecting and maintaining cables gets harder. Developing ROV-installable wet-mate connectors, as an alternative to dry-mated cable, became an engineering priority for the industry.
This 33kV hybrid wet-mate connector was needed so cables no longer had to be raised from the seabed to the surface to connect and reconnect them.
What we did
From concept review to prototype drawings
We were appointed to review the concept the industrial team had come up with. We created a more detailed design and validated that the expanded concept would work.
We then produced prototype drawings for the plug, the right size for the job and with the right features.
The outcome
In use today, at lower cost
The WetMate in the image is based on our design and is in use today, with much lower installation time and maintenance costs than expected, and than the previous way of working.
Once installed, the WetMate is precision remote monitored, which reduces routine maintenance and diver intervention and has improved health, safety and affordability.
Project outcomes
What the design delivers
- No need to raise cables to the surface
- Remote monitoring once installed
- Less routine maintenance and diver intervention
- Better health, safety and affordability
How we did it
Proving a concept before it goes subsea
We took the team’s idea, developed it in detail and validated it, so they could move to a prototype with confidence.
- 01ReviewReview of the client’s concept
- 02DevelopDetailed design and validation
- 03PrototypePrototype drawings for the plug
More case studies
Other projects we can talk about
More engineering design for energy and infrastructure.

Pump modernisation
Re-engineered thrust bearings for 60-year-old sewage pumps
Pump modernisation case study →
Crane grillage
Design review and FEA for a safety-critical crane grillage
Crane grillage case study →
Track gauge weld
A gauge corner restoration machine for tram line maintenance
Track gauge weld case study →Got a concept that needs proving?
From design reviews to detailed design and prototype drawings, tell us about your idea and we’ll give you an honest view of how we can help.